POLICE NOTICE
Resurfacing of A14 Port of Felixstowe Road (Eastbound & Westbound)
Atkins Limited, working on behalf of the Highways Agency, will start nightly A14 eastbound carriageway resurfacing (weather permitting) between junction 61, Felixstowe South Interchange and Junction 62, Dock Gate No.1 Roundabout on Wednesday 28 January 2009 (working hours 8pm to 6am) and each subsequent night until 6am on Saturday 31 January 2009.
Westbound resurfacing between the Junction 61 on slip road and the Dock spur Rail Bridge will overlap with the last night of the eastbound work Friday to Saturday and then two nights from 8pm on Monday 1 February finishing at 6am on Wednesday 4 February 2009 (note no weekend working).
The carriageway resurfacing affects both lanes in each direction and to carry out the resurfacing safely will require a full A14 carriageway closure of firstly the eastbound side and then the westbound side as work takes place. The limits of this full carriageway closure are; between the start of the Junction 61 entry and exit slip roads and the Dock Gate No.1 roundabout entry and exit on the A14.
Throughout the period of both phases of the resurfacing works a signed diversion route will operate using the A154 Trinity Avenue, Dock Gate No.2 roundabout and the A154 Walton Avenue to the Dock Gate No.1 roundabout at the A14. When westbound carriageway works take place, traffic will be held on Trinity Avenue at a red light signal to await convoy along the A14 westbound at slow speed through the last part of the works about 800 metres.
TUC blogs are now at www.tuc.org.uk/blogs
-
Touchstone blog is no longer publishing new content, as we’ve moved the
TUC’s new policy blog content to our main website. You can read new blogs
from th...
7 years ago
No comments:
Post a Comment